Remodel Readiness Question
#17
Have you mapped out a rough timeline that includes design, permitting, construction, and time to settle back in?
Why It Matters
Understanding the rhythm of a remodel reduces anxiety and helps plan real life around it.
The Downfall
Unrealistic timing leads to frustration and costly rushing.
Do It Right
Sketch an outline: design (2–8 mo), permits (3–12 mo), construction (4–12 mo+). Planning for pace keeps peace.